Beach

Beach
Los Angeles, CA 2015

Monday, May 17, 2010

Remodel, Phase 1 Almost Complete

It's been about 3 weeks since we moved, and this past weekend it felt like we really, really settled into the place. I was in a pretty bad place the week after we returned from California because there was so much stuff that had to be done. I was overwhelmed and stressed out dealing with construction, kids, mess & unpacking, but then I just let go of any idea of "have to." Amazingly enough, when I gave up any idea of accomplishing anything I started to accomplish a whole lot. We still have lots of boxes and a basement sorely in need of organization, but most things are in their place and we've gotten rid of enough boxes that we can stash what we still have out.
So, here's a rundown of what we have done so far:

-New windows
-3 bay windows
-Refinished wood floors
-Painted EVERYTHING
-New appliances
-New tile in kitchen & kitchenette
-New hardwood floor in dining room
-Carpet & paint in rec room (photos coming soon)
-Complete bathroom remodel (photos coming soon)

There are still some "small" jobs and on-going projects that need to take place, but Remodel 2010 is pretty much done (just waiting for the granite to be cut for the bathroom countertop,and then I'll post bathroom photos). Remodeling and moving has been a lot of work, but I am very happy with the progress we have made on our new home!
Here are the before & after photos:

Living Room
 
Living Room Bay Window
Dining Room
Degen's Room 
(All our new windows are amazing. These guys were artists and made every window like a beautiful picture on the wall.)

No comments:

Post a Comment